Setting a Project Code
You can set a project code when you create a project, or add one at any time afterward.1
Set the code at project creation
On the New project form, enter your code in the Project code
(optional) field. Setting it now means the project is coded from its first
export.
2
Add or change the code later
Open the project and select the Project Details tab. Edit the Project
code (optional) field and select Save. Clear the field to remove the
code. Project Admins and Org Admins can edit it; everyone else on the
project sees it read-only.
A project code is free-form text, up to 64 characters — Parlé does not check
its format. Use exactly the format your billing or matter management system
expects. The same code can be used on more than one project, for example
several workstreams under one cost centre: Parlé points it out when you type a
code that another project you can see already uses, but does not stop you, and
spend is reported under the same code for each of them.
Engineering code
ENG-4417Client matter
ASHWORTH-MAProject number
2024-PROJ-001How the Code Flows
The code belongs to the project, not to individual messages. You do not need to re-enter it or tag individual conversations — every conversation in the project is reported under the project’s code. On the Usage screen, grouping by project adds a Project code column to the Breakdown table, and the CSV export carries the same value in aProject Code column. Feed that export into your billing system and the AI cost appears alongside other client expenses, already coded, with no manual matching required.
A report shows the code the project has when the report is run. If you
change a project’s code mid-engagement, every export you download afterwards —
including one covering earlier months — shows the new code, and exports you
downloaded before the change keep the old one. If an engagement moves to a new
matter number and the two need to stay separate, start a new project for it
rather than re-coding the existing one.
Exporting by Project Code
1
Open Usage
Select Usage in the main sidebar. The Usage screen is for Org Admins.
2
Group by Project
Set Group by to Project. The code column is included only on a
project grouping, because no other row is a project.
3
Choose your date range and projects
Select the range and filter to specific projects if needed. Leave the
project filter empty to export all projects.
4
Download CSV
Select Download CSV above the breakdown table.
TOTAL row for the whole period — don’t sum the Cost column without excluding it. Each row carries the project’s code in the Project Code column, its cost in the Cost column, and the currency that cost is in — your organization’s reporting currency — in the Currency column.
Read the columns by their header names rather than by position: some columns appear only when there is something to report, so a column’s position can differ from one export to the next. See Usage Analytics for every column, and Currencies and Exchange Rates for how the reporting currency is chosen.